OUR PROJECTS
We focus on the entire process of the project, concept through completion.
Our experience combined with our dedication to providing outstanding customer service and quality projects, has helped Gosslink Engineering Limited become a leader in Engineering.

Installation of 33kv underground cable to enable transfer of Maroko 33kv feeder from 60mva 132/33kv transformer at Ajah transmission to 100mva 132/33kv transformer for evacuation of power for EKEDC.

Provision of all necessary materials required and relocation of 33kv feeders from existing 3x60mva 132/33kv transmission substation,33kv switchyard for EKEDC Akangba transmission station

Rehabilitation of 33kv Ikate express overhead lines and its connection to 100mva transformer at Ajah transmission station for EKEDC

Construction of 33kv, 2-bus system and installation of 6 nos of 33kv motorised gang isolators with interlock at Adelabu injection station switchyard for EKEDC

Provision of 15mva mobitral to Keffi injection station, EKEDC

Maintenance of 33kv/11kv overhead lines/trace clearing for EKEDC network

Construction of 33kv gantry support structures for ibeju and Eelemoro 33kv line for the evacuation of load from new 100mva 132/33kv transformer at Ajah transmission station, EKEDC

Relocation of Ikeja electric facility for construction/road expansion at Ojodu Berger by CCECC Ttrace widening of 11 kv and 33kv feeders within Ikeja Electric (ie) Network

Construction of 33kv gantry support structures for ibeju and Eelemoro 33kv line for the evacuation of load from new 100mva 132/33kv transformer at Ajah transmission station, EKEDC

Relocation of Ikeja electric facility for construction/road expansion at Ojodu Berger by CCECC Ttrace widening of 11 kv and 33kv feeders within Ikeja Electric (ie) Network

Rehabilitation of 48 nos injection substations for EKEDC